HM Designers Architect
Get in touch

01 Kanal House – Scheme 3

Residential October 6, 2023

The submission drawings and working and M.E.P. drawings have been submitted to the RDA for approval.
Scope of Work:

  • Submission drawings
  • Working drawings
  • M.E.P. drawings

Submission Drawings:

The submission drawings were prepared in accordance with RDA by-laws and include the following:

  • Site plan
  • Floor plans
  • Elevations
  • Sections
  • Key plan
  • Car parking plan

Working Drawings:

The working drawings were prepared in accordance with good engineering practices and include the following:

  • Detailed floor plans
  • Detailed elevations
  • Detailed sections
  • Schedules
  • Specifications

M.E.P. Drawings:

The M.E.P. drawings were prepared in accordance with good engineering practices and include the following:

  • Electrical drawings
  • Mechanical drawings
  • Plumbing drawings
  • Date : 14.05.2020
  • Client : Mr. Abdul Sattar
  • Status : Completed
  • Location : Scheme III, Rawalpindi
Project Details